Disrupting the Industry with the Fastest Framing Methods

Disrupting the Industry With the Fastest Framing Methods

All Steel's complete CFS systems allow for quicker erection of wall and floor packages by innovating & streamlining the traditional process. With vertical range of 4-12 stories, the end result is a durable, lightweight building shell package erected in less time.

All Steel Mid-Rise panelized wall and floor system packages are guaranteed to meet the needs of your mid-rise project, while also providing significant project cost savings.

Fastest Framing Methods

Disrupting the Industry

All Steel Mid-Rise offers innovative Cold-Formed Steel (CFS) wall and floor framing systems for fully managed Design Build or Design Supply packages. The end result is a lightweight, long-lasting, and economical building shell package for Hospitality and Residential structures up to 12 stories allowing for quicker building occupancy and return on investment.

All Steel's complete CFS systems allow for quicker erection of wall and floor packages by innovating & streamlining the traditional process. With vertical range of 4-12 stories, the end result is a durable, lightweight building shell package erected in less time.

1. Start

2. System Selection

All Steel assists in system selection based on project requirements.

2. Design & Engineering

All Steel provides value engineered support through design & engineering phase.

3. Drawings

All Steel engineers coordinate & expedite construction drawings for a quick approval process.

4. Material Order

Bill of materials are generated from detailed drawings.

5. Fabrication

Prefab begins prior to onsite erection to speed the process with quality assurance.

6. Delivery & Erection

Just in time delivery throughout the construction process.

7. Finish